SPIKES INSTALLATION

AviClips

Straight gutters and some profiled gutters take std Gutter Clip, roll topped gutters need Lipped Gutter Clip.

For where spikes stuck on sill would prevent window from opening. Can be stuck or screwed on. Use Activator and Avifix and squeeze the glue to 1mm thick max.

Saves gluing preparation - can clip straight onto beam without cleaning. Removable for painting.

Back to top ▲


Adhesives

Avisil
Neutral curing silicone. Best product for dry conditions
Cures 2mm/24h (at 20°C/65% RH). Temp range -60 to +180°C

Avifix High Tack
MS polymer. Can be used if slightly damp. Application temp +1 to 30°C. Cures 2-3mm/24h (at 20°C/65% RH). Temp range -40 to +90°C

Aquafix
For use when it is raining
Does not fully set

Soudafalt
Bituminous elastomere
For anchoring spikes to bitumen or roofing felt
Does not set

Back to top ▲


Preparation

Back to top ▲


Gluing

Apply at least 5mm bead of adhesive into the glue guide, more if the surface is very uneven.

Back to top ▲


Positioning

Press firmly into place, overhanging the edge of the ledge by 5mm. If fitting multiple rows, allow max 65mm between rows medium pressure and 50mm heavy pressure.

Back to top ▲


Variations

Pipes - use cable ties to prevent spikes falling off before glue cures.

Curved Surfaces - split the strips across the snap lines and stick them on as separate sections. Whole strips might spring up.

Edge Protection - spikes can be installed just at the edge of a ledge if the perceived problem is only droppings on the face of the building

Back to top ▲


new catalogue